CAP1882: Report of the CAA’s Post Implementation Review of London Luton Airport’s Airspace Change Proposal - Runway 26 Brookmans Park RNAV-1 Standard Instrument Departure Procedures

Please find below details of the CAA Publication you have selected. Dependent on availability, you are able to download the file, or purchase a printed copy.

 

UK-EU Transition

References to EU regulation or EU websites in our guidance will not be an accurate description of your obligations or rights under UK law – read more.

Reference:CAP1882
Title:Report of the CAA’s Post Implementation Review of London Luton Airport’s Airspace Change Proposal - Runway 26 Brookmans Park RNAV-1 Standard Instrument Departure Procedures
Description:Report of the CAA’s Post Implementation Review of London Luton Airport’s Airspace Change Proposal - Runway 26 Brookmans Park RNAV-1 Standard Instrument Departure Procedures.

The following annexes have been published alongside this report:

Annex A London Luton Airport PIR requirements and data provided
Annex B London Luton Airport Operations Ltd (LLAOL) Assessment
Annex C London Luton Airport Runway 26 Brookmans Park RNAV-1 SID Track Analysis Review
Annex D CAA analysis of complaint data from non-aviation stakeholders
Annex E SurveyMonkey Analysis
Annex F LLAOL Flt-RPT-003-17 South Luton Community Noise report V1
Annex G LLAOL Flt-RPT-004-17 Sandridge Community Noise report V1
Annex H July 2015 vertical plot track diagram comparison with July 2016
Annex J August 2014 track dispersion and density plot comparison with March 2017 and August 2017
Annex K July 2015 vertical plot track diagram comparison with August 2017
Annex L Complaint data map
Annex M Complaint data map (with hand-drawn locations)


Status:Current
Review Comment:None
Version:1
Date:6 February 2020
View File:Open document in new windowDownload PDF667kb
Purchase Copy:Printed copy not available for purchase

Accessibility Statement