CAP2198: Report of the CAA’s Post Implementation Review of London Gatwick Airport’s Modified Route 5 Runway 08 RNAV-1 Standard Instrument Departure Procedures

Please find below details of the CAA Publication you have selected. Dependent on availability, you are able to download the file, or purchase a printed copy.

 

UK-EU Transition

References to EU regulation or EU websites in our guidance will not be an accurate description of your obligations or rights under UK law – read more.

Reference:CAP2198
Title:Report of the CAA’s Post Implementation Review of London Gatwick Airport’s Modified Route 5 Runway 08 RNAV-1 Standard Instrument Departure Procedures
Description:A report on the review completed by the CAA under Stage 7 of the Airspace Change Process, the Post Implementation Review (PIR), of the implementation of the modified Route 5 RNAV-1 Standard Instrument Departure at Gatwick Airport. The report sets out the framework within which the review has been conducted and details the data that has been analysed in order to reach the conclusions on whether the minor modification of the Route 5 design is a better replication than that achieved by the original Route 5 RNAV-1 SID implemented in November 2013.

Annex A: Route 5 Modified RNAV-1 SID Track Analysis has been published alongside this report.


Status:Current
Review Comment:None
Version:1
Date:17 November 2021
View File:Open document in new windowDownload PDF409kb
Purchase Copy:Printed copy not available for purchase

Accessibility Statement