CAP1794: Post Implementation Review of Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) Airspace Change

Please find below details of the CAA Publication you have selected. Dependent on availability, you are able to download the file, or purchase a printed copy.

 

EU exit

Please note that, in the event of UK participation in EASA and mutual recognition of licences and certificates ceasing, some CAA website content and application forms may continue to carry the EASA logo or reference the EU or EASA rather than the UK CAA in the short term. These will be updated in due course following the outcome of the transition period negotiations on the long-term aviation relationship between the UK and the EU. In the meantime, the guidance provided and the application forms accessed via the CAA website portal will continue to be valid.

Reference:CAP1794
Title:Post Implementation Review of Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) Airspace Change
Description:The CAA has completed the PIR of the Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) airspace change proposal and is summarised in CAP 1794
As a result of our analysis, the CAA has concluded that the the Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) PIR does show that the proposal has been implemented and operated as expected.

The CAA’s airspace change process for the Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) airspace change request implemented on 1 May2014 and 13 October 2016 has now concluded.


Status:Current
Review Comment:None
Version:1
Date:30 March 2020
View File:Open document in new windowDownload PDF833kb
Purchase Copy:Printed copy not available for purchase

Accessibility Statement